From 2eaff5b79fed364d5eba5eb38e4b7bf76326884d Mon Sep 17 00:00:00 2001 From: DanConwayDev Date: Wed, 3 Dec 2025 11:19:40 +0000 Subject: remove docs archive --- docs/archive/2025-11-04-session-summary.md | 176 ----------------------------- 1 file changed, 176 deletions(-) delete mode 100644 docs/archive/2025-11-04-session-summary.md (limited to 'docs/archive/2025-11-04-session-summary.md') diff --git a/docs/archive/2025-11-04-session-summary.md b/docs/archive/2025-11-04-session-summary.md deleted file mode 100644 index 150dd84..0000000 --- a/docs/archive/2025-11-04-session-summary.md +++ /dev/null @@ -1,176 +0,0 @@ -**ARCHIVED: 2025-11-04** -**Session:** Strategic Planning & Test Validation Prep -**Outcome:** Decided to validate grasp-audit against ngit-relay first - ---- - -# Session Summary: Strategic Planning - -**Date:** 2025-11-04 -**Duration:** ~3 hours -**Status:** ✅ Complete - Ready for implementation - ---- - -## What We Accomplished - -### 1. Strategic Analysis -- ✅ Analyzed two approaches: TDD parallel vs. test-first -- ✅ Evaluated git-http-backend crate for inline authorization -- ✅ Validated hybrid architecture (git2 + git-http-backend + system git) -- ✅ Decided to test ngit-relay first (1-2 day investment) - -### 2. Documentation Created -- ✅ `current_status.md` - TDD implementation plan for ngit-grasp -- ✅ `analysis-summary.md` - git-http-backend validation -- ✅ `strategic-recommendation.md` - Test strategy decision -- ✅ `git-http-backend-analysis.md` - Deep dive into crate -- ✅ `authorization-flow.txt` - Visual flow diagram - -### 3. Documentation Archived -All planning docs moved to `docs/archive/2025-11-04-*`: -- `ngit-grasp-implementation-plan.md` - Full TDD plan (for later) -- `git-http-backend-validation.md` - Crate analysis -- `test-strategy-decision.md` - Why test-first approach -- `git-http-backend-deep-dive.md` - Detailed crate analysis -- `authorization-flow-diagram.txt` - Visual reference - -### 4. New Current Status -Created fresh `work/current_status.md` for Phase 1: -- **Goal:** Validate grasp-audit against ngit-relay -- **Timeline:** 2 days -- **Phases:** Setup → Build tests → Validate → Document -- **Ready to begin immediately** - ---- - -## Key Decisions - -### ✅ Test ngit-relay First -**Decision:** Build and validate grasp-audit test suite against reference implementation before implementing ngit-grasp - -**Rationale:** -- Only 1-2 day investment -- Eliminates "is it the test or the code?" debugging -- Provides reference behavior documentation -- Same total timeline but higher confidence -- Lower risk of wasted implementation effort - -**Alternative Rejected:** TDD parallel development (higher risk, same timeline) - -### ✅ Hybrid Architecture Validated -**Decision:** Use git-http-backend (forked) + git2 + system git - -**Components:** -- `git-http-backend` - HTTP protocol handling (will fork for inline auth) -- `git2` - Repository management, ref operations -- System git - Pack operations (upload-pack, receive-pack) - -**Why:** Best balance of control, reliability, and implementation effort - ---- - -## Resources Available - -### Reference Implementation -- **Location:** `../ngit-relay/` -- **Docker:** `ghcr.io/danconwaydev/ngit-relay:latest` -- **Endpoints:** - - Nostr: `ws://localhost:8080` - - Git: `http://localhost:3000` - -### Test Suite -- **Location:** `grasp-audit/` -- **Status:** Basic structure, NIP-01 smoke test working -- **Next:** Add GRASP-01 Git compliance tests - -### Documentation -- **GRASP Spec:** https://gitworkshop.dev/danconwaydev.com/grasp -- **NIP-34:** https://nips.nostr.com/34 -- **Archived Plans:** `docs/archive/2025-11-04-*` - ---- - -## Next Session Goals - -### Phase 1: Setup (30 min) -```bash -cd ../ngit-relay -docker-compose up -d -# Verify services running -``` - -### Phase 2: Build Tests (1 day) -- Create `grasp-audit/src/specs/grasp01_git.rs` -- Create `grasp-audit/src/git.rs` (test helpers) -- Add git2 dependency -- Implement all GRASP-01 Git tests - -### Phase 3: Validate (1 day) -- Run tests against ngit-relay -- Fix test bugs (not ngit-relay) -- Document reference behavior -- Iterate until all pass - -### Phase 4: Document (2 hours) -- Test suite documentation -- Reference behavior guide -- Prepare for ngit-grasp implementation - ---- - -## Files to Reference - -### For Implementation (Later) -- `docs/archive/2025-11-04-ngit-grasp-implementation-plan.md` - Full TDD plan -- `docs/archive/2025-11-04-git-http-backend-validation.md` - Crate details -- `docs/archive/2025-11-04-authorization-flow-diagram.txt` - Visual reference - -### For Current Phase -- `work/current_status.md` - Test validation plan -- `docs/archive/2025-11-04-test-strategy-decision.md` - Why this approach -- `../ngit-relay/README.md` - Reference implementation docs - ---- - -## Metrics - -### Time Investment -- Planning & Analysis: ~3 hours -- Next Phase (Test Validation): ~2 days -- Future Phase (Implementation): ~3 weeks - -### Confidence Level -- Test-first approach: 95% confident this is right path -- Architecture decisions: 90% confident (validated) -- Timeline estimates: 80% confident (reasonable) - ---- - -## Lessons Learned - -### 1. Test Validation is Critical -Having a reference implementation to test against is a huge advantage. Use it! - -### 2. Upfront Planning Pays Off -The 3 hours of analysis and planning will save weeks of implementation time. - -### 3. Documentation Structure Matters -Archiving session work keeps things clean and makes it easy to reference later. - -### 4. Strategic Thinking > Speed -Taking 2 days to validate tests is smarter than rushing into implementation. - ---- - -## Ready for Next Session - -**Status:** ✅ Ready to begin Phase 1 -**First Command:** `cd ../ngit-relay && docker-compose up -d` -**Reference:** `work/current_status.md` - -**Goal:** By end of next session (2 days), have a validated GRASP-01 Git test suite that we can confidently use to implement ngit-grasp. - ---- - -*Session complete. All work archived. Ready to proceed with test validation phase.* -- cgit v1.2.3